The originally planned curriculum (see [PokharaWorkshopCurriculumOriginal] was adjusted during the workshop, taking into account the participants experience levels and expectations.
A full archive version of the workshop wiki is available here: http://nepal.wire.less.dk/wiki/
General
- Breakfast: 7.30 h
- Morning session: 9.00 - 12.30 h (with a little break in the middle)
- Lunch: 12.30h
- Afternoon session: 14.00h - 18.30h (with tea and snack break)
- Dinner: 21.00h
- Evenings: open for LABs, meeting in the workshop room, questions, exercise, ...
Day by Day
Monday, 14 Sept
- Arrivals during the day
Tuesday, 15 Sept
- Opening & Welcome
- Introductions, motivations, expectations? - see http://nepal.wire.less.dk/wiki/index.php/Who_is_here
- Who we are
- What we expect to learn and do
- What we expect to do in the future
- Language wishes
- Introductions, motivations, expectations? - see http://nepal.wire.less.dk/wiki/index.php/Who_is_here
- The Nepalwireless / Mustang Network - Intro [Indiver]
- How to share what we learn - introduction to working with wikis [Sebastian] - demo and exercise with workshop servers' mediawiki
- Wireless devices - basic configuration - [Sebastian] - wireless_device_configuration_2009.pdf
LAB1: Wireless configuration lab: APs - with focus on Ubiquiti & Linksys gear - building a simple Mustang network in the classroom
Wednesday, 16 Sept
- continue LAB1: Configuration
- Introduction to radio physics [Sebastian] - wireless_radio-physics_slides_edit_nepal.pdf
- Introduction to link budget and dB math [Sebastian] - wireless_link__budget_slides_edit_nepal.pdf
LAB 2: Link Budgets [[Sebastian] - wireless_link__budget_slides_edit_nepal.pdf
- Long links [sebastian, using Material by Ermanno Pietrosemoli] Long_Distance_Links_2009-screen_Ermanno.pdf
- Long links in south america [Sebastian, using Ermannos slides] and Nepal [Mahabir]
Thursday, 17 Sept
- Structured Troubleshooting - theory and exercise [Sebastian] - structured_troubleshooting_2009_slides.pdf
- Internet Protocols - IP planning - subnetting, routing, etc [Gaurab]
- Antenna Basics [sebastian] wireless_antennas-cables_slides_edit_2009_nepal.pdf
- Planning software (Radio_Mobile), field techniques (GPS, compass, etc)
LAB3: Radio_Mobile
- Preparing village work for next week; calculate and evaluate possibilties for a 400 km link
Friday, 18 Sept
- Power over Ethernet, grounding, and lightning protection [Sebastian]
- Outdoor installation
- General weather protection, lightning protection and grounding
LAB4: BWireless device configuration, continued
Saturday, 19 Sept
- Preparation of Village Installations: Link planning, node sheets, equipment configuration, logistics
LAB5: Wireless device configuration for actual deployment
Additonal evening sessions and sessions during deployment
- Dimensioning of solar power systems (needs material)
- PoE practical (needs material)
- GNU/Linux basics, installing and running Ubuntu
Last modified 9 years ago
Last modified on 10/07/09 03:41:20
Attachments (9)
- 08_en_mmtk_wireless_antennas-cables_slides_edit_2009_nepal.pdf (2.7 MB) - added by sebastian_buettrich 9 years ago.
- dBmath-screen.pdf (1.1 MB) - added by sebastian_buettrich 9 years ago.
- local_ubuntu_repositories_with_apt-mirror.pdf (203.9 KB) - added by sebastian_buettrich 9 years ago.
- Long_Distance_Links_2009-screen_Ermanno.pdf (1.1 MB) - added by sebastian_buettrich 9 years ago.
- Radio_Mobile_2009-screen.pdf (1.3 MB) - added by sebastian_buettrich 9 years ago.
- structured_troubleshooting_2009_slides.pdf (254.8 KB) - added by sebastian_buettrich 9 years ago.
- wireless_device_configuration_2009.pdf (690.2 KB) - added by sebastian_buettrich 9 years ago.
- wireless_link__budget_slides_edit_nepal.pdf (1.6 MB) - added by sebastian_buettrich 9 years ago.
- wireless_radio-physics_slides_edit_nepal.pdf (1.1 MB) - added by sebastian_buettrich 9 years ago.